Earthquake resistant structure
2 basements + Ground + 32 storied RCC structure
Covered car parks in basement levels
Internal walls with gypsum plaster
Interior walls finished in acrylic emulsion paint
Water/oil bound distemper for ceiling
Exterior walls with textured emulsion paint
Double height ground floor entrance lobby with flooring in marble
Vitrified tile flooring and texture paint in basement lobbies
Passenger and service elevators of reputed make
Typical floor lobby in vitrified flooring and texture paint on walls
Staircase flooring in Kota/ Vitrified Tile/ Cement Tile with distemper paint on walls and ceiling
Marble flooring and skirting in foyer/living/dining
Vitrified tile flooring and skirting for other bedrooms and kitchen
Laminated flooring with wooden Finish and skirting in Master bedroom
Vitrified tile flooring in balcony, terraces and utility
Vitrified tile flooring in toilets
Granite vanity counter with wash basin in all toilets
Glass shower partition in all toilets
Vitrified tiles dado up to false ceiling
CP and sanitary ware (wash basin, EWC) in all toilets of reputed make
Provision for water heater in all toilets
Vitrified tile dado up to two feet height above the granite counter in kitchen
Adequate electrical and plumbing points
Provision for washing machine & dishwasher in utility
Kitchen granite counter top with single bowl, single drain board stainless sink
Provision for water purifier and geyser point in kitchen
Reticulated gas pipeline with individual meter for each apartment
Timber door frame with pre-engineered shutters finished with veneer and polish on both sides
Good quality hardware of reputed make
Timber door frame and pre-engineered hollow core shutters finished with laminate on both sides
Good quality hardware of reputed make
UPVC/ Aluminium glazed sliding or open able windows and Doors as per location
MS railing in all balconies except for projected balconies from 29th to 32nd floors
MS safety grills for all windows up to second floor
Glass railing in projected balconies from 29th to 32nd floors
TV points in living room and all bedrooms
Split AC power point in living room and all bedrooms with provision to keep AC outdoor units
Branded modular switches
Back-up DG power for 1 light and 1 fan in each bedroom and living area, 1 refrigerator and 1 light in kitchen
Video door phone in all apartments
CCTV inside the lifts
CCTV coverage between main entry of the complex and each tower reception lobby
Intercom facility between main lobby of each tower, main entry point to the complex and individual apartments
Provision for broadband for each apartment
Provision for telephone points in living room and master bedroom
All apartments will have sprinkler system
Fully automatic fire detection system
Treated water through a water treatment plant within the project
Sewage effluent shall be treated, and the treated water shall be used for flushing and landscaping
Organic Waste Converter to convert organic waste to manure which shall be used for landscaping
Many of the natural materials used in the project including marble, granite, wood are subject to variations in tone, grain, texture, pattern and color which are beyond control of the project
There are possibilities that material specified in show flat may not be available at the time of construction. In such instances the company reserves the right to replace unavailable material with suitable alternatives of similar quality available in the market
Certain manufactured materials like ceramic/vitrified tiles, UPVC windows/doors, sanitary ware, glass etc. are subject to color variations due to inherent manufacturing process, items being manufactured in different lots. Batch variations in final product is beyond control of the project
Landscape completion will be along with the completion of the entire project
Enquire
Back
Close
Best viewed in
landscape mode
Earthquake resistant structure
2 basements + Ground + 32 storied RCC structure
Covered car parks in basement levels
Internal walls with gypsum plaster
Interior walls finished in acrylic emulsion paint
Exterior walls with textured emulsion paint
Water/oil bound distemper for ceiling
Double height ground floor entrance lobby with flooring in marble
Typical floor lobby in vitrified flooring and texture paint on walls
Vitrified tile flooring and texture paint in basement lobbies
Staircase flooring in Kota/ Vitrified Tile/ Cement Tile with distemper paint on walls and ceiling
Passenger and service elevators of reputed make
Marble flooring and skirting in foyer/living/dining
Laminated flooring with wooden Finish and skirting in Master bedroom
Vitrified tile flooring and skirting for other bedrooms and kitchen
Vitrified tile flooring in balcony, terraces and utility
Vitrified tile flooring in toilets
Vitrified tiles dado up to false ceiling
Granite vanity counter with wash basin in all toilets
CP and sanitary ware (wash basin, EWC) in all toilets of reputed make
Glass shower partition in all toilets
Provision for water heater in all toilets
Vitrified tile dado up to two feet height above the granite counter in kitchen
Kitchen granite counter top with single bowl, single drain board stainless sink
Adequate electrical and plumbing points
Provision for water purifier and geyser point in kitchen
Provision for washing machine & dishwasher in utility
Reticulated gas pipeline with individual meter for each apartment
Timber door frame with pre-engineered shutters finished with veneer and polish on both sides
Good quality hardware of reputed make
Timber door frame and pre-engineered hollow core shutters finished with laminate on both sides
Good quality hardware of reputed make
UPVC/ Aluminium glazed sliding or open able windows and Doors as per location
MS safety grills for all windows up to second floor
MS railing in all balconies except for projected balconies from 29th to 32nd floors
Glass railing in projected balconies from 29th to 32nd floors
TV points in living room and all bedrooms
Branded modular switches
Split AC power point in living room and all bedrooms with provision to keep AC outdoor units
Back-up DG power for 1 light and 1 fan in each bedroom and living area, 1 refrigerator and 1 light in kitchen
Video door phone in all apartments
CCTV coverage between main entry of the complex and each tower reception lobby
CCTV inside the lifts
Intercom facility between main lobby of each tower, main entry point to the complex and individual apartments
Provision for telephone points in living room and master bedroom
Provision for broadband for each apartment
All apartments will have sprinkler system
Fully automatic fire detection system
Treated water through a water treatment plant within the project
Sewage effluent shall be treated, and the treated water shall be used for flushing and landscaping
Organic Waste Converter to convert organic waste to manure which shall be used for landscaping
Many of the natural materials used in the project including marble, granite, wood are subject to variations in tone, grain, texture, pattern and color which are beyond control of the project
Certain manufactured materials like ceramic/vitrified tiles, UPVC windows/doors, sanitary ware, glass etc. are subject to color variations due to inherent manufacturing process, items being manufactured in different lots. Batch variations in final product is beyond control of the project
There are possibilities that material specified in show flat may not be available at the time of construction. In such instances the company reserves the right to replace unavailable material with suitable alternatives of similar quality available in the market
Landscape completion will be along with the completion of the entire project
Back
Apartment Specifications – Tower 9 & 10
Close
Close