Earthquake resistant structure (Seismic Zone III compliant)
Mix of RCC and block masonry
Imported marble or equivalent for living, dining, passages and master bedroom
Vitrified flooring in kitchen
Rough textured vitrified tiles in the utility area
Vitrified flooring in kids’ bedroom
Rough textured vitrified tiles flooring in all toilets
Granite vanity with countertop wash basin in all the toilets
Bathroom CP fittings (Shower Mixer, Health Faucet and other CP fittings) of repute make
Sanitary ware (wash basin, EWC) in all toilets of repute make
Geyser / hot water system and exhaust fan in all Toilets
Modular Kitchen (without kitchen appliances)
Adequate Electrical Points for Kitchen appliances
CP fittings of repute make
Piped Gas Provision
Granite platform with high-end stainless-steel sink with drain board Dado up to 2'0" above platform
Exhaust Fan in Kitchen
Gas Leak Detector
Main Door - Red Miranti frame with elegant flush door shutters finished with veneer
Toilet Doors - Flush doors with laminate on both sides
Internal Doors - Red Miranti frame with elegant flush door shutters finished with premium laminate finish
Good quality brushed steel hardware of repute make
Concealed electrical wiring in apartments with ISI marked copper wires
Split A/C in living / dining and all bedrooms
ELCB for each apartment
Adequate Electrical Points of branded modular switches and sockets of repute make
Points for TV, telephone and internet provision in all bedrooms & living room
Video Door Phone (VDP) with integrated intercom at the entrance to the apartment
Powder Coated Aluminium sliding doors/windows with clear glass and granite/marble still
Entrance lobby: polished granite and imported marble flooring with cladding, plastic emulsion or acrylic or texture paint on ceiling
Staircase flooring up to first floor in polished granite and plaster finish with acrylic or emulsion paint. Upper floors flooring with kota stone and plaster finish OBD with kota skirting
Smoke Detectors / Heat Detectors, Sprinklers, Fire Hydrants and Extinguishers in designated common areas as per norms
DG power backup for common areas and critical loads
Vitrified and granite combination in the typical lift lobby (all levels) and vitrified tiles in typical lift lobby (terrace) plastic emulsion or acrylic or texture paint on ceiling
Servant's toilet flooring with rough textured tiles, and ceiling plaster finish with OBD
Elevators from repute make
CCTV coverage of designated common areas
All lift lobbies & common corridors will have sprinkler system
Fire hydrant and sprinkler at each floor as well as car parking areas in the basement & stilt on the ground floor, including external yard hydrants as per norms
Fully automatic fire protection system
Sewage effluent shall be treated and the treated water shall be used for flushing and landscaping
IGBC certification for reducing the consumption of energy, water and materials to ensure improvement of public health, safety and environment
OWC - Organic Waste Converter would convert all organic waste to manure which will be used for landscaping
Enquire
Back
Close
Best viewed in
landscape mode
Earthquake resistant structure (Seismic Zone III compliant)
Mix of RCC and block masonry
Imported marble or equivalent for living, dining, passages and master bedroom
Vitrified flooring in kids’ bedroom
Vitrified flooring in kitchen
Rough textured vitrified tiles flooring in all toilets
Rough textured vitrified tiles in the utility area
Granite vanity with countertop wash basin in all the toilets
Sanitary ware (wash basin, EWC) in all toilets of repute make
Bathroom CP fittings (Shower Mixer, Health Faucet and other CP fittings) of repute make
Geyser / hot water system and exhaust fan in all Toilets
Modular Kitchen (without kitchen appliances)
Granite platform with high-end stainless-steel sink with drain board Dado up to 2'0" above platform
Adequate Electrical Points for Kitchen appliances
Exhaust Fan in Kitchen
CP fittings of repute make
Gas Leak Detector
Piped Gas Provision
Main Door - Red Miranti frame with elegant flush door shutters finished with veneer
Internal Doors - Red Miranti frame with elegant flush door shutters finished with premium laminate finish
Toilet Doors - Flush doors with laminate on both sides
Good quality brushed steel hardware of repute make
Concealed electrical wiring in apartments with ISI marked copper wires
Adequate Electrical Points of branded modular switches and sockets of repute make
Split A/C in living / dining and all bedrooms
Points for TV, telephone and internet provision in all bedrooms & living room
ELCB for each apartment
Video Door Phone (VDP) with integrated intercom at the entrance to the apartment
Powder Coated Aluminium sliding doors/windows with clear glass and granite/marble still
Entrance lobby: polished granite and imported marble flooring with cladding, plastic emulsion or acrylic or texture paint on ceiling
Vitrified and granite combination in the typical lift lobby (all levels) and vitrified tiles in typical lift lobby (terrace) plastic emulsion or acrylic or texture paint on ceiling
Staircase flooring up to first floor in polished granite and plaster finish with acrylic or emulsion paint. Upper floors flooring with kota stone and plaster finish OBD with kota skirting
Servant's toilet flooring with rough textured tiles, and ceiling plaster finish with OBD
Smoke Detectors / Heat Detectors, Sprinklers, Fire Hydrants and Extinguishers in designated common areas as per norms
Elevators from repute make
DG power backup for common areas and critical loads
CCTV coverage of designated common areas
All lift lobbies & common corridors will have sprinkler system
Fully automatic fire protection system
Fire hydrant and sprinkler at each floor as well as car parking areas in the basement & stilt on the ground floor, including external yard hydrants as per norms
Sewage effluent shall be treated and the treated water shall be used for flushing and landscaping
OWC - Organic Waste Converter would convert all organic waste to manure which will be used for landscaping
IGBC certification for reducing the consumption of energy, water and materials to ensure improvement of public health, safety and environment
Back
Tower G, H
Close
Close