BKC 28
Structure
Earthquake resistant RCC structure (Seismic Zone III compliant)
Internal walls mix of RCC and block masonry
Plastering Painting & Polishing
Internal apartment walls finished with gypsum and acrylic emulsion paint
Ceiling finished with acrylic emulsion paint
Exterior tower walls finished with textured paint
Flooring
Vitrified tile flooring for living, dining, passages, kitchens and in all bedrooms
Rough textured ceramic tile flooring in all toilets
Toilet
Countertop wash basin in all toilets
Ceramic tile dado upto door height in all toilets
Sanitary ware in all toilets of American Standard / Jaquar or equivalent make
CP fittings of American Standard / Jaquar or equivalent make
Exhaust fan in all toilets
Instant Geyser
Kitchen
Modular Kitchen (without appliances) and Granite platform with stainless steel sink with drain board
Dado up to 2'0" above platform
Electrical point for hob and chimney
Exhaust fan
Piped Gas connection
Gas Leak Detector
Door
Main Door – Hardwood / Engineered door frames, fire rated flush door with veneer finish on both sides
Internal Doors & Toilet Doors - Hardwood / Engineered door frames, flush door with laminate finish on both sides
Branded hardware of Godrej or equivalent make for all doors
Windows
UPVC windows
MS Railing
Electrical
Concealed electrical wiring in apartments with Earth Leakage protection
Electrical Points of branded modular switches and sockets of Legrand / Schneider / Havells or equivalent make
Air Conditioning in living/dining and all bedrooms
Points for TV in all bedrooms & living room
Telephone point in living room
Internet point in living and master bedroom
Video Door Phone at each apartment
Common Areas
Ground floor entrance lobby with Marble flooring
Typical lift lobbies – Flooring in Vitrified tiles and Granite frame around lift doors
Staircase flooring from ground floor till first habitable floor in polished granite and other floors in Kota flooring or equivalent
Smoke Detectors / Heat Detectors, Sprinklers, Fire Hydrants and Extinguishers in designated common areas as per CFO requirements
Elevators of Fujitec / Thyssen Krupp / Otis or equivalent make
DG backup for lifts, common areas lighting, parking system
CCTV coverage of designated common areas / lifts
Gym
Rubberized flooring
Toilets with rough textured ceramic tiles
Multipurpose Hall
Vitrified or equivalent flooring
Rough textured ceramic tiles in toilets
Children’s Play Area
Climbing / Graffiti wall
Play equipment
Fire Safety
Fire hydrant and sprinkler at each floor as well as car parking areas in the basement & stilt on ground floor, including external yard hydrants as per CFO requirements
Sorry!
We're facing an issue in catering to your request. Please try again after some time.
You've already registered!
We have your details. Stay tuned, we will get in touch with you shortly.
Thank you for
reaching out
We've successfully registered
your details, and will get back to
you soon.